Work Schedule

 

 

Work in the NE section consists of Mowing and Grading

 

Work in the NW section consists of Pulling ditches and Milling and Grading

 

Work in the SE section consists of Chipping limbs

 

Work in the SW section consists of Grading, Lime rocking a road

 

 

We received 1 DOC Squads for a total of 3 people

 

 

1 Squad will be Chipping limbs in SE

 

 

1 Squad from The Transition House (3 people) will be patching pot holes and driveways in SE, NE & NW