Tentative Work Schedule

August 24, 2021

 

Work in the NE section consists of Grading NE 171st, NE 5th and NE 19th Ln., Cleaning out a Ditch and Patching Pot Holes on NE 20th Ave.

 

Work in the NW section consists of Grading NW 71st Ave., Cleaning out a Ditch on NW 45th Ave and Patching Pot Holes on NW 214th St.

 

Work in the SE section consists of Cleaning out a Ditch on SE 21st Ave and Mowing SE 109th St, SE 21st Ave and SE 144th St

 

Work in the SW section consists of Grading SW 132nd Ave and SW 168th St

 

 

We received 2 DOC (BCSO-JAIL) with a total of 3 Inmates

 

1 Squad with 1 Inmates will be fixing an Erosion spot on the Bridge on SW 161st

 

1 Squad with 2 Inmates will be Weed eating the ditches on SE 144th St. (Preacher Lee Road)