Tentative Work Schedule

April 24, 2023

 

Work in the NE section consists of Cleaning out Ditches on NE 21st Ave. and Mowing the Shoulders in the Petesville area

 

Work in the NW section consists of Grading NW 177th St. and NW 62nd Ave. and Patching Pot Holes on NW 177th St.

 

Work in the SE section consists of Grading SE 16th Ave., SE 87th St. and SE 43rd., Patching Pot Holes on SE 35th St. and Mowing SE 57th St., SE 109th St., SE CR 100A and SE 144th St.

 

Work in the SW section consists of Grade and Water SW 106th Ave. and Grading SW 101st Ave.