Tentative Work Schedule

Work in the NE section consists of Straightening out the ditch so water will flow on NE 154th

 

Work in the NW section consists of Replacing a  crossover pipe on NW 193rd St., Cleaning out ditch on NW 53rd Ave., Side Arm Mower on NW 84th and 193rd., Grading NW 193rd, 70th, 188th, 185th and 75th Ave.

 

Work in the SE section consists of Grading SE 38th, 41st, 43rd, 49th, 61st and SW 66th, Mowing up SE CR 18 to SE SR 100 and SE CR 21B to Melrose and Milling SE 66th St.

 

Work in the SW section consists of Installing a culvert on SW 80th Pl an Side Arm Mower on SW 92nd, 147th and the Intersection of SW CR 18 and SW CR 231

 

 

We received 3 DOC Squads for a total of 19 people

 

1 Squad will be picking up trash and weed eating SE CR 18 from 301 to SR 100, SE CR 325 and SE CR 221

 

1 Squad will be picking up trash and weed eating NW CR 229

 

1 Squad will be picking up trash and weed eating SE 144th (by Vystar Credit Union) to SR !00 and SE CR 100A