Tentative Work Schedule

January 29, 2020

 

Work in the NW section consists of Grading NW 219th St. and Patching Driveways on NW CR 125

 

Work in the SE section consists of Hauling Dirt from Keystone Airport to Keystone pit

 

Work in the SW section consists of Prepping SW 101st Ave. for Fog Sealing

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be Picking up trash and weed eating on NW CR 225

 

1 Squad will be directing traffic on SW 101st Ave.

 

1 Squad will be Picking up trash on SW CR 18 from Dedan Loop to Dedan Loop