Tentative Work Schedule

April 8, 2021

 

Work in the NE section consists of Pulling up a Culvert at the corner of NE 218th St. and NE CR 225, Opening up Culverts on NE 17th Ave., NE 20th Ave. and NE 17th Loop and Watering NE 204th St.

 

Work in the NW section consists of Grading NW 51st Lane and NW 70th Ave. and Watering NW 185th

 

Work in the SE section consists of Grading SE 41st and SE 43rd, Fixing the erosion around the pond at the Old Landfill and Mowing Speedville Park and Vogel Pond with the Zero Turns

 

Work in the SW section consists of Grading SW 155th St.

 

We did not receive any DOC Squads

 

The DOC Squads from the Bradford County Jail and our DOC Officer assisted with Mowing and weed eating the Speedville Park and the Vogel Pond