Tentative Work Schedule

February 9, 2021

 

Work in the NE section consists of Grading NE 20th Lane, Picking up limbs and debris on NE 154th St., Mowing ROW on NE 19th Lane and Clean out ditch and get water flowing on NE 17th Ave.

 

Work in the NW section consists of Grading NW 44th Ave. and Cleaning out the ditch to get water flowing on NW 38th Ave.

 

Work in the SE section consists of picking up limbs and debris on SE 44th Ave., Picking up dirt at the Theressa Fire Department and Clean out the ditch to get water flowing on SE 21st Ave.

 

Work in the SW section consists of Grading SW 132nd Ave. and SW 168th St.

 

 

We did not receive any DOC Squads today