Work Schedule

 

Work in the NR section consists of Grading

 

Work in the NW section consists of Pulling ditches and Cutting, Trimming & Chipping

 

Work in the SE section consists of Zipping a road and Patching pot holes

 

Work in the SW section consists of Grading, Fixing a washout and Edging side walks in Brooker

 

 

We received 2 DOC Squads for a total of 12 people

 

1 Squad will assist with Cutting, Trimming and Chipping in the NW section

 

1 Squad will be Mowing, Weed eating and picking up trash behind the mowers in SW section

 

 

1 Squad from The Transition House (3 people) will be assisting with patching pot holes in the SE section