Tentative Work Schedule

March 18, 2021

 

Work in the NW section consists of Grading NW 74th Ave., NW 215th Way and NW 236th St., Cleaning out the ditch on NW CR 225, Hauling off large stump on NW CR 225, Mowing ROW on NW 196th St and NW NW 223rd and Picking up and Hauling off debris on NW 180th St. and NW 223rd.

 

Work in the SE section consists of Grading SE 46th Loop and SE 50th St. and Mowing SE CR 21B and SE CR 214

 

Work in the SW section consists of Grading SW 114th St. and Mowing SW CR 225 and SW CR 18

 

 

We received 1 DOC Squad for a total of 6 people that directed Traffic for Cleaning out ditches and Picking up and hauling off large stump on NW CR 225 

 

 