Tentative Work Schedule

January 14, 2019

 

Work in the NE section consists of adding limerock to NE 204th St.

 

Work in the NW section consists of Grading NW 38th Ave. with the Road Boss

 

Work in the SE section consists of Patching pot holes on SE 21st Ave.

 

Work in the SW section consists of Installing a culvert at 7455 SW CR 225

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be Patching pot holes on SE 21st Ave.

 

1 Squad will be Cleaning up at the Shop

 

1 Squad will be directing traffic to install a culvert at 7455 SW CR 225