Work Schedule

 

Work in the NW section consists of Digging Ditches, Blowing out & Opening up Culvert and Crossover, Patch pot holes and Grading

 

Work in the SE section consists of Zipping a road, Grading milled roads and Mowing

 

Work in the SW section consists of Mowing

 

 

We received 3 DOC Squads for a total of 20 people

 

1 squad will be picking up trash and weed eating in SW

 

1 Squad will be performing Traffic Control for digging ditches and opening up culverts in NW

 

1 Squad will be Patching pot holes in NW