Tentative Work Schedule

 

August 13, 2018

 

Work in the NE section consists of Mowing NE 171st St. and NE 17th Ave. with the Side Arm Mower

 

Work in the NW section consists of Building up NW 41st Ave., Pulling ditches on NW 193rd and 71st and Digging the ditch on NW 55th

 

Work in the SE section consists of Mowing SE 144th St. with the Side Arm Mower and SE CR 18

 

Work in the SW section consists of Repairing SW 132nd and making a head wall on SW 132nd and Repair culvert on SW 168th 

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be building a head wall on SW 132nd

 

1 Squad will be picking up trash and weed eating on SW CR 227 then SW CR 225

 

1 Squad will be picking up trash  and weed eating on SE CR 18 starting at 301 and going to SE SR 100, SE CR 221 & SE CR 325