Tentative Work Schedule

October 30, 2019

 

Work in the NW section consists of Grading on NW 203rd, NW 205th, NW 105th, NW 110th and NW 198th and Dig an Outfall Ditch on NW CR 225

 

Work in the SE section consists of Mowing SE CR 18, SE CR 18A and SE 9th Ave.

 

Work in the SW section consists of Grading SW 101st Ave. and Blocking off culverts at 14167 SW 101st Ave and also across from this address, Mowing SW CR 237, SW CR 18 and SW CR 231 (Dedan Loop) and Patching a driveway on SW CR 235

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be Weed Eating all of the ditches on NW CR 229

 

1 Squad will be assisting with Cleaning up around the Mechanic Shop