Work Schedule

 

Work in the NE section consists of Installing Crossover culverts, Patching pot holes, Grading

 

Work in the NW section consists of Milling a road, Grading, Trimming limbs, Mowing

 

Work in the SE section consists of Patching pot holes

 

Work in the SW section consists of Installing Crossover culverts, Grading, Milling a road, Installing a Crossover culvert

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be assisting with traffic for Trimming in the NW section

 

1 Squad will be assisting with traffic for installing crossover culverts in the NE and SW

 

 

1 Squad from The Transition House (3 people) will be assisting with Patching Pot holes and driveways in the NW & SE