Work Schedule

 

 

Work in the NW section consists of Digging and Scooping Ditches and Grading

 

Work in the SE section consists of Spreading limerock on a road, Grading, Patching pot holes and Mowing

 

Work in the SW section consists of Patching pot holes and Mowing

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will assist in Patching pot holes in SE & SW

 

1 Squad will be conducting traffic control for Scooping Ditches in NW

 

1 Squad will be Picking up trash and weed eating in the SW