Tentative Work Schedule

October 7, 2020

 

Work in the NE section consists of Mowing ROW on NE 204th St. & NE 20th Lane and Cleaning out the high spots in ditch and Opening up Crossover pipes on NE 20th Lane

 

Work in the NW section consists of Grading NW 178th Loop, NW 182nd, NW 257th St. & NW 63rd, Patching Pot Holes NW 200th St. and Cleaning out high spots in ditch and Opening Crossover pipes on NW 201st

 

Work in the SE section consists of Grading SE 129th and SE 126th

 

Work in the SW section consists of Chipping SW CR 18 & SW CR 235, Mowing SW CR 235 & SW CR 231, Keeping Tree debris out of road on SW CR 235 and Fixing a driveway on SW CR 225

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be assisting with Chipping limbs on SW CR 18 

 

1 Squad will be assisting with Chipping limbs on SW CR 235