Work Schedule

 

 

Work in the NE section consists of Patching driveways & pot holes and Mowing

 

Work in the NW section will consist of Grading, Digging out ditches and Pulling ditches

 

Work in the SE section consists of Zipping and Packing

 

Work in the SW section consists of Grading

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be weed eating around mailboxes and sign and Picking up debris at the Hampton Boat Ramp and in Pleasant Grove area 

 

1 Squad will be picking up trash in the NE section

 

1 Squad will assist with Traffic Control for digging ditches in the NW section

 

 

1 Squad from The Transition House ( 4 people) will assist in patching driveways