Tentative Work Schedule

September 27, 2022

 

Work in the NE section consists of Cleaning out Culvert ends on NE 161st St. and NE 156th St.

 

Work in the NW section consists of Grading NW 55th Ave., NW 71st Ave. between NW CR 229 and NW CR 233 and adding Limerock and Grading NW 75th Ave., Cleaning out Culvert pipe ends on NW 55th Ave. and NW CR 229 at NW CR 229A, Patching Pot Holes and troughs on NW 200th St., NW 61st Ave. and NW 219th St. off NW CR 225. and Mowing ROW on NW 216th St.

 

Work in the SE section consists of Patching Pot Holes on SE 15th Ave. and Cleaning out Culvert pipe ends on SE 36th Loop

 

Work in the SW section consists of Mowing SW CR 237, SW CR 18 and SW CR 231 (Dedan Loop)

 

 

 

We received 2 DOC (BCSO-JAIL) Officers and 3 Inmates

 

1 Officer will be Prepping for Ian and getting all Chain Saws and Equipment ready 

 

1 Officer and 3 Inmates will be assisting with Patching Pot Holes and Troughs on