Tentative Work Schedule

February 15, 2022

 

Work in the NE section consists of Patching Pot Holes and Mowing NE 17th Ave. and NE 14th Ave.

 

Work in the NW section consists of Grading NW 41st Ave., NW 44th and NW 219th, Cleaning out ditches on NW 178th Loop and Patching Pot Holes on NW 177th 

 

Work in the SE section consists of Grading SE 86th St. and Blowing out a Culvert on SE 4th Ave.

 

Work in the SW section consists of Grading SW 66th Ave. and Blowing out a Culvert on SW 69th 

 

 

We received 1 DOC (BCSO-JAIL) Officer and he didn't get any Inmates.