Work Schedule

 

Work in the NE section consists of Repairing wash outs and Patching culverts

 

Work in the NW section consists of Grading, Cutting trees, Chipping and Mowing

 

Work in the SE section consists of Grading and Mowing ponds

 

Work in the SW section consists of Grading, Cutting trees and working on wash out on bridge

 

 

We received 3 DOC Squads for a total of 19 people

 

1 Squad will be assisting with traffic and cutting and chipping debris in SW section

 

1 Squad will be mowing and weed eating ponds

 

1 Squad will be mowing, weed eating and picking up trash in NW section

 

 

1 Squad from The Transition House (3 people) will be repairing washouts in NE section and patching culvert in NW section