Tentative Work Schedule

April 14, 2022

 

Work in the NE section consists of Grading NE 173rd St. and NE 21st Lane

 

Work in the NW section consists of Grading NW 44th Ave. and NW 53rd Ave.

 

Work in the SE section consists of Grading SE 129th St. and SE 52nd St., Patching Roadway after Water Main Repair on SE 3rd Pl., Mowing ROW on SE 26th Ave. and Mowing SE CR 214 and SE 9th Ave.

 

Work in the SW section consists of Blowing out a Culvert on SW 101st St.

 

 

We received 2 DOC (BCSO-JAIL) Officers and 2 Inmates

 

1 Officer will be filling in for Dale Hayes

 

1 Squad and 2 Inmates will be assisting with the Patching of the Roadway on SE 3rd Pl.