Tentative Work Schedule

January 23, 2024

 

Work in the NE section consists of Grading NE 173rd St., NE 12th Ave., NE 19th Ave., NE 171st St., NE 5th Ave. and NE 21st Lane,

 

Work in the NW section consists of Patching Pot Holes on NW 75th Ave. (Mize area)

 

Work in the SE section consists of Grading both sides of SE 26th Ave., SE 147th St. and SE 25th Ave. and Scooping the Ditches on SE 46th Ave.

 

Work in the SW section consists of Grading SW 137th St. and Mowing the Shoulders of the Road on SW 132nd Ave.

 

We will also be Loading and Hauling Dirt to New River Solid Waste Site

 

 

We received 2 DOC (BCSO-JAIL) Officers and 2 Inmates

 

1 Officer will be assisting Maintenance

 

1 Officer and 2 Inmates will be Picking up Trash on NW 75th Ave., SW CR 18, SW CR 235  and NW CR 229