Tentative Work Schedule

July 5, 2023

 

Work in the NE section consists of Grading NE 12th Ave., NE 171st St. and NE 173rd St.

 

Work in the NW section consists of Cleaning out a Ditch on NW 203rd St. and Mowing NW CR 233, NW 216th St. and NW CR 200A

 

Work on the SE section consists of Grading SE 16th Ave., SE 87th St. and SE 41st and Mowing the Shoulders of the Road on SE 125th Ter.

 

Work in the SW section consists of Grading SW 136th St., SW 155th Ave. and SW 114th, Patching Pot Holes on SW CR 235 and Mowing the Shoulders of the Road on SW 101st Ave.