Tentative Work Schedule

February 12, 2019

 

Work in the NE section consists of Grading Carter Road & NE 247th St.

 

Work in the NW section consists of Grading NW 219th & NW 257th  and Digging the ditch on NW CR 235 (Nettle's)

 

Work in the SE section consists of Adding milling and limerock to SE 46th Loop and Grading SE 49th Ave. with the Road Boss

 

Work in the SW section consists of Grading SW 136th & SW 155th, Bridge work and fixing washouts on SW CR 18 and Patch troughs on SW CR 18 & SW CR 227

 

 

We received 3 DOC Squads for a total of 18 people

 

1 Squad will be Patching troughs on SW CR 18 & SW CR 227

 

1 Squad will be assisting with the installation od Speed Jumps on SE 2nd Ave. in the Keystone Golf & Country Club area

 

1 Squad will be directing traffic for bridge work and patching washouts on SW CR 18