Tentative Work Schedule

January 25, 2022

 

Work in the NW section consists of Grading NW 41st.,NW 41st., NW 209th and NW 35th, Patch Pot Holes and Driveways on NW CW 229 and Scoop out dirt in front of culvert and Fix a Driveway on NW CR 229

 

Work in the SE section consists of Grading SE 8th, SE 55th, SE 58th and in Crystal Lake Homesites

 

Work in the SW section consists of Grading SW 163rd

 

 

We received 1 DOC (BCSO-Jail) Officer with 4 Inmates and will be assisting with working on fence at Pratt Street Retention pond