Work Schedule

 

Work in the NW section consists of Zipping a road, Grading, Pulling ditches and Replacing a Crossover pipe

 

Work in the SE section consists of Grading, Mowing, Cut back trees and limbs and Patching driveways

 

Work in the SW section consists of Move equipment area to get ready to Zip a road

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will assist in Cutting, Trimming and Chipping in the SE & SW section

 

1 Squad will be Weed eating, Mowing around mailboxes, driveways and signs and Picking up trash along SE 109th St.

 

1 Squad will be Weed eating, Mowing around mailboxes, driveways and signs and Picking up trash in the Lincoln City area

 

 

1 Squad from The Transition House  (2 people) will be assisting in patching driveways in the SE section