Tentative Work Schedule

August 16, 2023

 

Work in the NE consists of Grading NE 171st St. and NE 20th Lane

 

Work in the NW section consists of Grading NW 178th Loop, NW 205th and NW 219th St. and Mowing Shoulders on NW 36th Ave.

 

Work in the SE section consists of Paving SE 48th Ave.

 

Work in the SW section consists of Grading SW 101st Ave. and SW 163rd St. and Mowing SW CR 227 and SW CR 225