Tentative Work Schedule

March 13, 2023

 

Work in the NE section consists of Mowing around sidewalks and mailboxes on NE CR 225

 

Work in the NW section consists of Grading NW 219th and NW 53rd

 

Work in the SE section consists of Grading SE 52nd and SE 11th, Shoot Grade and Clean out ditch on SE 48th and Patch sides of the road on SE 136th

 

Work in the SW section consists of Grading SW 101st