Work Schedule

 

Work in the NW section consists of Pulling ditches & Milling, Grading, Chipping limbs, Mowing and Patching pot holes

 

Work in the SE section consists of Installing culverts

 

Work in the SW section consists of Grading

 

 

We received DOC Squads for a total of 9 people

 

1 Squad will be Chipping limbs in the NW

 

1 Squad will be Picking up trash in SE

 

 

1 Squad from The Transition House (3 people) will be Patching pot holes in the NE