Tentative Work Schedule

April 22, 2019

 

Work in the NE section consists of Installing a culvert on 14th Ave.

 

Work in the NW section consists of Zipping and Packing NW 177th St. and NW 62nd Ave., Grading EW 251st, NW 28th Ave. NW 25th & NW 238th and Mowing NW 251st St. & NW CR 125

 

Work in the SE section consists of Digging the ditch on SE 144th St. and Cleaning out the ditch and Building a Head Wall on SE 23rd Ave. on 23rd Ave.

 

Work in the SW section consists of Grading SW 168th and Chipping limbs on SE 132nd Ave.

 

 

We received 3 DOC Squads for a total of 12 people

 

1 Squad will be Trimming trees on SW 132nd Ave.

 

1 Squad will be Building a Head Wall on SE 23rd Ave.

 

1 Squad will be Digging ditches on SE 144th St. and Directing traffic on NE 14th Ave. installing a culvert