Tentative Work Schedule

January 31, 2022

 

Work in the NE section consists of Cleaning out Ditches on NE 19th Lane

 

Work in the NW section consists of Grading NW 211th

 

Work in the SE section consists of Grading roads off SEE CR 18 going towards SE SR 100 and Pick up Trash on SE 8th Ave. (Speedville) and SE CR 21B

 

Work in the SW section consists of Grading SW 101st Ave. and SW 163rd St.

 

 

We received 1 DOC (BCSO-JAIL) Officer and 2 Inmates and they will be assisting with Laying Sand Bags and Pumping water out, getting the bridge on SW CR 231 (Dedan Loop) ready to pour Concrete.