Tentative Work Schedule

 

August 7, 2018

 

Work in the NE section consists of Chipping trees and debris on NE 15th Pl

 

Work in the NW section consists of Grading NW 74th Ave. down NW CR 225 to SR 100, Limerock NW 77th and Scoop ditches on NW 177th 

 

Work in the SE section consists of Grading with the Road Boss on SE 30th St., SE 16th Way, SE 16th St

 

Work int he SW section consists of Grading SW 120th Ave., Repair driveway on SW 155th, Repair ditch and driveway on SE 66th St. and Install  culverts on SW 104th St. and SW CR 18

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be repairing a ditch and driveway on SE 66th St.

 

1 Squad will be Chipping  trees and debris on NE 15th Pl.

 

1 Squad will be assisting with traffic control and installing culverts on SW 104th St. and SW CR 18