Tentative Work Schedule

December 5, 2018

 

Work in the NE section Grading NE 247th, Mowing  NE 173rd St. & 12th Ave. with the Side Arm Mower and Mowing NE 17th Ave.

 

Work in the NW section consists of Working the milling on NW 185th St., Grading NW 178th Loop, NW 257th and 41st. and Patching sides of the road (shoulders) on NW 223rd St.

 

Work in the SE section consists of Mowing SE CR 100A and SE CR 230A and Trimming ROW in Lincoln City

 

Work in the SW section consists of Grading SW 137th, 144th, 168th and 132nd

 

 

We received 3 DOC Squads for a total of 19 people

 

1 Squad will be Patching the sides of the road on NW 223rd St.

 

1 Squad will be Picking up trash and Weed eating SW 75th Ave.

 

1 Squad will be Trimming ROW in Lincoln City