Tentative Work Schedule

October 26, 2020

 

Work in the NW section consists of Grading NW 214th Ave., Prepping NW 214th St., Cut limbs, Mulch and Chip limbs on NW CR 225 and Clean out ditch on NW 53rd Ave.

 

Work in the SE section consists of Grading SE 61st St. & SE 86th St., Cleaning out culverts on SE 148th St. and Mowing Keystone Landfill, SE CR 21B and SE 8th Ave,

 


Work in the SW section consists of Grading SW 66th Ave. and SW 132nd Pl.

 

 

We received 1 DOC Squad for a total of 5people

 

This Squad will be assisting with Chipping on NW CR 225