Tentative Work Schedule

January 31, 2019

 

Work in the NE section consists of Patching driveways at 18773 NE 223rd St. and NE 16th Ave. in the Country Club area

 

Work in the NW section consists of Grading NW 178th Loop, NW 105th, NW 110th and NW 198th, Patch driveways at 12475 NW CR 225 and 11261 NW CR 225 and Dig ditches on NW CR 235

 

Work in the SE section consists of Digging out the ditch at 14615 SE 44th Ave.

 

Work in the SW section consists of Grading SW 144th, SW 168th & SW 137th, Digging a ditch on Edwards Road, Patching driveways at 6576 SW CR 100A and 10067 SW 80th Pl. and Replacing Guardrail on SW 163rd St.

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be Replacing Guardrail at SW 163rd St. and Patching a driveway on NE 16th Ave.

 

1 Squad will be Picking up trash & Weed eating on NW CR 225

 

1 Squad will be directing traffic for digging ditches at 14615 SE 44th Ave and NW CR 225