Work Schedule

 

Work in the NE section consists of Mowing and Pushing debris at the City site

 

Work in the NW section consists of Grading, Mowing, Patching shoulders, bridge and driveways and cutting, trimming and chipping ROW

 

Work in the SE section consists of Grading and patching pot holes

 

Work in the SW section consists of Building up road, fixing washouts and patching driveways

 

 

We received 3 Squads for a total of 17 people

 

1 Squad will be cutting, trimming and chipping ROW

 

1 Squad will be mowing a retention pond in Keystone Golf & Country Club and assisting in patching pot holes

 

1 Squad will be performing traffic control for installing culverts

 

 

1 Squad from The Transition House ( 3 people) will be patching driveways on NW 22nd Ave. and SW 180th Ave.