Tentative Work Schedule

May 10, 2021

 

Work in the NE section consists of Adding limerock to NE 247th St.

 

Work in the NW section consists of Mowing ROW on NW 219th St, Patch a Driveway on NW CR 125 and Mowing Market Road and NW CR 229

 

Work in the SE section consists of Grading SE 46th Loop, SE 1st St. and SE 125th Ter.

 

Work in the SW section consists of Grading SW 66th Ave., Lowering a culvert on SW 65th Ave., Patch Pot Holes on SW 106th and Mowing Brooker Solid Waste

 

 

We had 1 DOC Squad (BCSO Jail Emp.) and had 5 people and Picked up trash on SW 75th Ave.