Tentative Work Schedule

August 12, 2019

 

Work in the NE section consists of Mowing NE 19th

 

Work in the NW section consists of Repairing a driveway at 7373 NW CR 229A and Mowing NW 59th Loop

 

Work in the SE section consists of Grading and Packing SE134th St. & SE 26th Ave. (both sides of SE CR 100A), Grading SE 31st and SE 50th, Installing a culvert on SE 48th Ave., Mowing SE CR 100A & SE CR 230A, SE 150th, all roads of SE 57th, SE 50th, SE 51st, SE 52nd, & SE 7th and Repairing a driveway at 4597 SE 6th Lane

 

Work in the SW section consists of  Grading SW 132nd Ave., SW 168th St. & SW 130th Pl. and Mowing SW CR 235 and SW CR 231

 

 

We received 3 DOC Squads for a total of 11 people

 

1 Squad will be Weed Eating SE CR 18, SE CR 325 and SE CR 221

 

1 Squad will be Weed Eating SW CR 18, SW CR  225 and SW CR 235A

 

1 Squad will be Directing traffic for installing culvert at SE 48th Ave.