Tentative Work Schedule

February 13, 2019

 

Work in the NE section consists of Installing a Crossover pipe at the intersection of NE 155th & NE 15th, Trim limbs on NE 204th & NE 20th Lane and Grade NE 171st with Road Boss 

 

Work int he NW section consists of Grading NW 251st, NW 25th & NW 238th, Dig ditch on NW CR 235, Repair culvert on NW 205th and Grade NW 36th with the Road Boss

 

Work in the SE section consists of Adding milling & limerock on SE 46th Loop, Install Speed Humps on SE 2nd Ave. and Grade SE 26th with the Road Boss

 

Work in the SW section consists of Grading SW 180th Ave.

 

 

We received 3 DOC Squads for a total of 16 people.

 

1 Squad will be Repairing a culvert on NW 205th St.

 

1 Squad will be Installing Speed Humps on SE 2nd Ave.

 

1 Squad will be directing traffic on NE 15th Ave.