Work in the NE section consists of Clean out ditches on NE 20th Ave. and Mow sidewalks with Zero Turn on NE CR 225

 

Work in the NW section consists of Grading roads off of NW CR 125, Opening up Outfall ditches on NW CR 233, Patching Pot Holes on NW 61st Ave. and NW 221st Way and Mowing NW CR 229

 

Work in the SE section consists of Grading roads off of SE CR 18

 

Work in the SW section consists of Grading SW 101st Ave. and SW 163rd St.

 

 

We received 1 DOC (BCSO-Jail) Squad with 3 Inmates and they will be Cleaning up the Market Road pit