Work Schedule

 

Work in the NE section consists of patching washouts and pot holes

 

Work in the NW section consists of Moving Zipper & equipment to NW section, Pulling ditches, Fix ruts & ditch, Put guardrail up at a bridge and Patch driveway

 

Work in the SE section consists of Packing road that was zipped, Build a head wall and Mow

 

Work in the SW section consists of Installing a driveway culvert

 

 

We received 3 DOC Squads for a total of 16 people.

 

1 Squad will assist in placing cement bags to build a head wall in the SE section

 

1 Squad will pick up trash and paper in SE section

 

1 Squad will direct traffic in the NW and SW section

 

 

1 Squad from The Transition House ( 3 people) will assist putting up guardrail at a bridge and patch a driveway in the NW section