Tentative Work Schedule

August 7, 2023

 

Work in the NW section consists of Grading NW 193rd St. and NW 71st Ave., Mowing NW CR 235 and Mowing the Sidewalk on NW CR 229 with the Zero Turns

 

Work in the SE section consists of Grading SE 16th Ave., SE 87th St. and SE 43rd Ave. and Opening up a Culvert on SE 41st

 

Work in the SW section consists of Grading SW 147th, SW 114th and SW 136th St. and Mowing SW CR 235