Tentative Work Schedule

August 17, 2021

 

Work in the NE section consists of Replacing a Culvert and Building a Head Wall on NE 171st St.

 

Work in the NW section consists of Cleaning out Culverts on NW 38th Ave.

 

Work in the SE section consists of Mowing SE CR 18, SE CR 325 and SE 36th Ave.

 

Work in the SW section consists of Grading SW 163rd St.

 

 

We received 2 DOC (BCSO-JAIL) Squads with a total of 4 Inmates

 

1 Squad with 2 Inmates will be assisting with Cleaning out Culverts on NW 38th Ave,

 

1 Squad with 2 Inmates will be assisting with Replacing a Culvert and Building a Head wall on NE 171st St.