Tentative Work Schedule

May 17, 2022

 

Work in the NE section consists of Grading NE 21st Lane, NE 12th Ave. and NE 173rd St., Mowing with the Zero Turns NE 17th, NE 154th, NE 15th and NE 16th and Mowing ROW in the Petesville area

 

Work in the NW section consists of Grading NW 178th Loop and Mowing NW CR 225

 

Work in the SE section consists of Cleaning out the ditches on SE 94th St.

 

Work in the SW section consists of Grading SW 132nd Ave. and SW SW 168th St. and Patching the edge of the road on SW CR 225A

 

 

We received 2 DOC (BCSO-JAIL) Officers and total 3 Inmates

 

1 Squad with 1 Inmates will be Cleaning up the sidewalk on NE 17th Ave.

 

1 Squad with 2 Inmates will be Picking up Trash and Weed Eating on SW 75th Ave. and SW CR 100A