Tentative Work Schedule

January 5, 2022

 

Work in the NW section consists of Grading NW 212th and NW 205th, Building a Headwall on the Crossover pipe on NW 105th Ave. and Mow ROW on NW 211th

 

Work in the SE section consists of Grading roads off of SE 21st Ave. and Filling in Driveways on SE 8th Ave.

 

Work in the SW section consists of Grading SW 155th St.

 

 

We received 1 DOC (BCSO-JAIL) Officer with 6 Inmates and they will be assisting with building a Headwall on NW 105th Crossover pipe