Work Schedule

 

Work in the NW consists of Pull & Mill a road

 

Work in the SE consists of Grading

 

Work in the SW section consists of Grading, Milling, Repairing ditches and Repairing a bridge

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will assist in Chipping limbs in NW

 

1 Squad will be picking up trash and weed eating in the NE

 

 

1 Squad from The Transition House (2 people) will be repairing a bridge in the SW