Work Schedule

 

 

Work in the NE section consists of Grading

 

Work in the NW section consists of Grading, Cutting, Trimming and Chipping

 

Work in the SE section consists of Zipping a road and Patching pot holes

 

Work in the SW section consists of Digging Ditches, Grading and Milling a road

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will assist in Cutting, Trimming and Chipping in the NW

 

1 Squad will assist with traffic control in the SW

 

 

1 Squad from The Transition House (3 people) will assist in Patching pot holes in the SE