Tentative Work Schedule

November 13, 2018

 

Work in the NE section consists of Pulling Ditches on NE 171st, 173rd, 12th and 5th.

 

Work in the NW section consists of Zipping NW 84th Ave, and Digging Ditches on NW 84th Ave.

 

Work in the SE section consists of Mowing SE 57th, 35th and 2nd with the Side Arm and Patching a driveway on SE 66th

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad Patching a driveway on SE 66th Ave.

 

1 Squad will be Weed Eating and Picking up trash around mailboxes and culverts on NW CR 225 and at 3114 NW CR 225

 

1 Squad will be directing traffic for digging  ditches on NW CR 225