Tentative Work Schedule

January 27, 2022

Work in the NE section consists of Cleaning out a ditch on NE 19th Lane and Add limerock and Spread over Culvert on NE 6th Ave.

 

Work in the NW section consists of Grading NW 212th, NW 188th, NW 193rd and Dirt part of NW 71st and Patch Holes on NW CR 2299

 

Work in the SE section consists of Grading SE 49th Ave., Mow ROW on SE 35th (Speedville area), SE 31st and SE 35th (across from Trinity Baptist Church) and add Limerock to a driveway on SE 5th Ave.

 

Work in the SW section consists of Grading SW 101st Ave., SW 87th, SW 105th, SW 92nd and SW 106th Ave.

 

 

We received 1 DOC (BCSO-JAIL) Officer and he does not have any Inmates