Tentative Work Schedule

August 8, 2019

 

Work in the NW section consists of Mowing NW CR 235 with Zero Turns

 

Work in the SE section consists of Limerocking SE 134th St., Grading Crystal Lake Homesites, SE 4th, SE 5th, SE 7th, SE 31st, SE 50th (Both sides of SE CR 21B) and SE 51st, Patching Pot Holes on SE 26th Ave. and Mowing SE 109th St., SE 21st Ave., SE 38th, SE 45th, SE 46th, SE 87th and SE 16th

 

Work in the SW section consists of Grading SW 1255th Ave. and SW 132nd Ave.. and Mowing SW 114th, SW CR 235 and SW 85th Lane

 

 

We received 2 DOC Squads for a total of 11 people

 

1 Squad will be Weed Eating around Bridges and Guardrails on SW CR 18

 

1 Squad will be Weed Eating around Bridges and Guardrails on NW 216th St.